精东影业影视

POETTKER NEARS COMPLETION OF FREEBURG HIGH SCHOOL CAMPUS IMPROVEMENTS PROJECT

 In PK-12 Education, 精东影业影视 News, Projects
Freeburg High School | 精东影业影视 Construction

Publication:

精东影业影视 Construction has a long history of partnering with K-12 schools and districts to bring their campus development initiatives to the next level. These collaborative relationships are founded on mutual respect, professionalism, integrity, safety, quality and dedication to the client鈥檚 needs and goals. 精东影业影视鈥檚 reputation of providing superb customer-focused services has provided the tools to grow primarily through repeat clients and referrals.

A true testament to 精东影业影视鈥檚 longstanding relationships and quality work is its partnership with . In the late 1990s, 精东影业影视 built a school wing for the district that was designed with the intent for a future second story addition. Today, 精东影业影视 Construction is serving as the construction manager for that 2nd story addition, with renovations to the 1st聽floor for the high school.

Due to enrollment growth and infrastructure concerns, Freeburg High School identified a need for additional STEM laboratory and classroom space. The district elected to expand vertically and returned to 精东影业影视 as their trusted contractor to ensure a successful project. The campus improvement project entails a new 18,500-sqaure-foot second story, a new hydraulic elevator, and complete interior renovations to the walls, flooring, ceilings, finishes, electrical, plumbing and fire protection.

鈥淭he Freeburg High School Improvement project required proactive preconstruction planning, detailed constructability reviews, and discussions about master planning for the campus to ensure this addition supports the district鈥檚 overall growth, program strategy and community needs for years to come,鈥 said Ryan 精东影业影视, president of 精东影业影视 Construction.

精东影业影视鈥檚 construction management team engaged in early preconstruction planning to work through not only means and methods of constructing the second story addition above the existing classroom wing, but also engaged its Corporate Compliance Team to ensure constructability details such as first floor structural bracing enhancements were critically examined, discussed, and vetted with the architectural and engineering team prior to implementation.

Like most school districts, scheduling and cost constraints are critical. With the district having flexibility of remote learning, the team implemented a plan to get started early to ensure the district would be ready to safely return kids back to school on the first floor in the fall, on schedule.

Construction and renovations are anticipated to wrap up in fall 2021, with students using the entire facility beginning January 2022.

Recent Posts
Safety Merit Badge CenterLitchfield Groundbreaking | 精东影业影视 Construction